📣 Put your book in front of over 200 readers with The Story Tavern!

← Skylar Thorne

INTERNAL USE ONLY // INSTITUTIONAL SECURITY PROTOCOL 74


Campus blueprints for general orientation and restricted sector auditing have been declassified for active archive access. Cross-reference these schematics directly with the primary student and faculty dossiers released earlier this week or with the books themselves!


DOCUMENT 74-A: MAIN CAMPUS (SURFACE GROUNDS & QUAD)


  • Sector Overview: North Quad fountain, East Wing, and the South Wing Corridor.
  • Perimeter Note: Tracks the surface thoroughfares connecting the central academic halls to the Arts Building and the service gates.


DOCUMENT 74-C: LIBRARY & ARCHIVES (RESTRICTED ANNEX)



  • Sector Overview: General Stacks, Archival Reading Rooms, and the Locked Gate descent.
  • Security Clearance: Level 5.
  • Restricted Note: Beyond the central iron divider sits the specialized research carrels and microform cabinets. The stairwell in the northern alcove provides direct, locked access down to Level B-2: Sub-Basement Periodicals & Regional Microfiche.


DOCUMENT 74-B: NULL ZONE (SUBTERRANEAN SECTOR)


  • Sector Overview: Multi-Purpose: Null Zone Training Sessions, Historical Archival Room, Campus Foundation Stone, and Logistics Holding.
  • Security Clearance: Level 5 / Restricted Access.
  • Off-Limits Advisory: This sector houses the sealed catacombs entrance and the restricted vaulted vaults. Unescorted personnel located within these perimeter corridors are subject to immediate institutional blacklisting and disciplinary transfer.


Use these schematics to track the physical transit lines and security blind spots across campus.


More classified case records will unseal as the series term advances.

♡ Like

Who Reacted

No reactions yet.

Comments

No comments yet. Be the first to reply.